2.2 Organizational structure

Practice exam-style IB Business and Management questions for Organizational structure, aligned with the syllabus and grouped by topic.

Verified by Azur
Verified by Azur
Paper
Difficulty
Status
Level
Question 1
SL • Paper 1
Easy
Calculator Permitted
SL • Paper 1
Easy
Calculator Permitted

BrightBite is a small producer of healthy lunch boxes for schools. The founder, Alia, has recently appointed team leaders in production and marketing, but she is unsure how much authority each team leader should have.

A

Define the term delegation.

[2]
Question 2
SL • Paper 1
Easy
Calculator Permitted
SL • Paper 1
Easy
Calculator Permitted

GreenNest is a garden design business with a founder, three project supervisors and twelve gardeners. The founder is considering whether the current organization chart is becoming too flat as the business grows.

An organization chart for GreenNest showing the founder at the top, three project supervisors on the next level, and twelve gardeners on the lowest level. Each project supervisor has several gardeners reporting directly to them. Lines clearly show formal reporting relationships and the chart has job-role labels only.
A

Outline two features of GreenNest’s organization chart.

[2]
Question 3
SL • Paper 1
Medium
Calculator Permitted
SL • Paper 1
Medium
Calculator Permitted

UrbanStep operates five footwear stores in one city. All store managers must obtain approval from head office before changing prices, ordering local advertising or dealing with customer complaints. Competitors are opening stores nearby and responding quickly to local trends.

A

Describe one advantage and one disadvantage for UrbanStep of using centralization.

[4]
Question 4
SL • Paper 1
Medium
Calculator Permitted
SL • Paper 1
Medium
Calculator Permitted

PureDrop manufactures reusable water bottles and travel mugs. The business is currently organized by function, with separate marketing, operations, finance and human resources departments. A new product manager has suggested changing to a product structure, with separate divisions for bottles and mugs.

A

Explain one advantage and one disadvantage for PureDrop of changing from a functional structure to a product structure.

[4]

Build a Practice Exam — Business and Management HL

Test your knowledge with a custom paper containing questions from selected topics.

Practice exam question preview
Practice exams dashboard preview
Question 5
HL • Paper 1
Medium
Calculator Permitted
HL • Paper 1
Medium
Calculator Permitted

QuickCart is an online grocery delivery business. Customer demand changes hourly because of social media trends and weather conditions. The operations director wants to decentralize more decisions to local delivery hub managers, including decisions about driver schedules and replacement products.

A

Explain one benefit and one cost to QuickCart of decentralizing decisions to local delivery hub managers.

[4]
Question 6
SL • Paper 2
Medium
Calculator Permitted
SL • Paper 2
Medium
Calculator Permitted

Nimbus Bikes (NB) manufactures electric bicycles. NB currently has a tall production structure. To reduce costs, the operations director is considering reducing the number of team-leader posts from eight to five. This is a reduction within the existing team-leader level; no whole hierarchical level is removed, so the change should not be assumed to shorten the chain of command.

Table 1: Selected production structure data for NB

Assume that all assemblers report directly to a team leader and are distributed approximately evenly among the team leaders.

Item

Current structure

Proposed structure after reduction in team-leader posts

Number of assemblers

64

64

Number of team leaders

8

5

Annual salary per team leader / US$

42 000

42 000

One-off severance cost per removed team leader / US$

—

24 000

Additional annual training and overtime support / US$

—

36 000

A

Calculate the average span of control of each team leader under the current structure and under the proposed structure. Show all your working.

[2]
B

Calculate NB's net cost saving in the first year of the proposed reduction in team-leader posts. Show all your working.

[2]
C

Comment on whether the proposed reduction in team-leader posts is appropriate for NB.

[2]
Question 7
SL • Paper 2
Medium
Calculator Permitted
SL • Paper 2
Medium
Calculator Permitted

Lyra Clinics (LC) operates a chain of private physiotherapy clinics. LC has a tall organizational structure. The chief executive officer (CEO) is considering removing the divisional manager level and making clinic managers report directly to the CEO, supported by new communication software.

Table 2: Selected organizational and cost data for LC

Item

Current structure

Proposed structure

CEO

1

1

Divisional managers

4

0

Clinic managers

16

16

Operational employees

96

96

Annual salary per divisional manager (US$)

76 000

Annual allowance per clinic manager for extra reporting duties (US$)

9 000

Annual communication software cost (US$)

52 000

A

Calculate the CEO's span of control under the current structure and under the proposed structure. Show all your working.

[2]
B

Calculate the annual net cost saving from removing the divisional manager level. Show all your working.

[2]
C

Comment on one possible disadvantage for LC of the proposed structural change.

[2]
Question 8
HL • Paper 1
Medium
Calculator Permitted
HL • Paper 1
Medium
Calculator Permitted

VoltHive develops charging systems for electric bicycles. Engineers, marketers and finance staff currently work in separate functional departments. A major city has asked VoltHive to develop a customized charging network within six months. The managing director is considering using a matrix structure for this contract.

A

Explain one advantage and one disadvantage for VoltHive of using a matrix structure for the city contract.

[4]

Build a Practice Exam — Business and Management HL

Test your knowledge with a custom paper containing questions from selected topics.

Practice exam question preview
Practice exams dashboard preview
Question 9
SL • Paper 2
Medium
Calculator Permitted
SL • Paper 2
Medium
Calculator Permitted

AquaPure (AP) sells domestic water filters in four regions. Complaints about faulty filters are currently approved by head office, a centralized structure. AP is considering decentralizing complaint decisions to regional managers so that customers receive faster responses.

Table 3: Regional complaint data for AP for one month

Region

Number of complaints

Average response time under head office approval (days)

Expected average response time if regional managers approve (days)

Estimated compensation cost per complaint per day of delay (US$)

North

120

6

3

25

East

80

5

2

25

South

150

7

4

25

West

50

4

2

25

A

Calculate the estimated monthly saving in compensation costs if AP decentralizes complaint approval to regional managers. Show all your working.

[2]
B

Comment on whether decentralization of complaint approval is appropriate for AP.

[2]
Question 10
SL • Paper 2
Medium
Calculator Permitted
SL • Paper 2
Medium
Calculator Permitted

TerraFoods (TF) produces two product ranges: plant-based meals and snack bars. TF currently uses a functional structure. Because customer demand is changing quickly, TF is considering a product-based structure. This would create separate product divisions but would duplicate some roles.

Table 4: Estimated annual financial effects of changing to a product-based structure

ItemEstimated annual amount, in US dollars
Current estimated contribution lost because product launches are delayed510 000
Estimated contribution lost after introducing product divisions210 000
Annual salary of plant-based product manager68 000
Annual salary of snack bar product manager62 000
Number of additional marketing analysts4
Annual salary per additional marketing analyst34 000
Number of additional finance administrators2
Annual salary per additional finance administrator30 000

Category

Item

Number of positions

Annual amount (US$)

Contribution loss

Current estimated contribution lost because product launches are delayed

—

510,000

Contribution loss

Estimated contribution lost after introducing product divisions

—

210,000

Salary cost

Plant-based product manager

1

68,000

Salary cost

Snack bar product manager

1

62,000

Salary cost

Additional marketing analysts

4

34,000

Salary cost

Additional finance administrators

2

30,000

A

Calculate the total annual additional salary cost of the proposed product-based structure. Show all your working.

[2]
B

Calculate the net annual financial effect of introducing the product-based structure. Show all your working.

[2]
C

Comment on one reason why TF might still choose a product-based structure.

[2]
Question 11
SL • Paper 2
Medium
Calculator Permitted
SL • Paper 2
Medium
Calculator Permitted

SecureSure (SS) provides home insurance. New legal regulations require more accurate checking of claims. SS currently has a decentralized claims structure. Senior managers are considering a more centralized and bureaucratic compliance structure.

Table 5: Monthly claims checking data for SS

Item

Current decentralized structure

Proposed centralized compliance structure

Number of compliance errors per month

24

6

Administrative checking hours per month

80

170

Fine or compensation cost per compliance error (US$)

1 200

1 200

Administrative labour cost per checking hour (US$)

30

30

A

Calculate the monthly net cost saving of the proposed centralized compliance structure. Show all your working.

[3]
B

Comment on whether a more bureaucratic structure is appropriate for SS.

[2]
Question 12
SL • Paper 1
Medium
Calculator Permitted
SL • Paper 1
Medium
Calculator Permitted

HarbourCare runs residential care homes for older people. New legal regulations require more detailed safety reporting and staff training records. At the same time, families of residents want quicker answers from local care-home managers. HarbourCare’s directors are considering making the structure more centralized and bureaucratic.

A

Analyse the appropriateness for HarbourCare of becoming more centralized and bureaucratic in response to the new regulations.

[6]

Build a Practice Exam — Business and Management HL

Test your knowledge with a custom paper containing questions from selected topics.

Practice exam question preview
Practice exams dashboard preview
Question 13
HL • Paper 1
Medium
Calculator Permitted
HL • Paper 1
Medium
Calculator Permitted

LunaWear is a fashion retailer based in Spain. It has grown rapidly through online sales in South Korea, Brazil and Canada. Customer preferences, labour laws and delivery expectations differ significantly between these countries. LunaWear’s chief executive is considering changing from a functional structure to a regional structure.

A

Analyse the appropriateness for LunaWear of changing to a regional structure as it expands internationally.

[6]
Question 14
HL • Paper 2
Medium
Calculator Permitted
HL • Paper 2
Medium
Calculator Permitted

PixelBridge (PB) develops customized software for corporate clients. PB currently uses a functional structure. Due to more complex client contracts and missed deadlines, PB is considering changing to a project-based organization.

Table 6: Estimated annual costs under two organizational structures for PB

Item

Current functional structure

Proposed project-based structure

Number of permanent specialists / number

18

14

Annual salary per permanent specialist / US$ per year

54 000

54 000

Number of functional managers / number

3

0

Annual salary per functional manager / US$ per year

72 000

Number of project managers / number

0

2

Annual salary per project manager / US$ per year

80 000

Freelance specialist days per year / days

0

120

Cost per freelance specialist day / US$ per day

350

Annual coordination software cost / US$ per year

0

24 000

Annual penalty costs for late projects / US$ per year

96 000

30 000

A

Calculate the annual cost saving if PB changes to the proposed project-based organization. Show all your working.

[3]
B

Comment on one possible limitation for PB of changing to a project-based organization.

[2]
Question 15
HL • Paper 2
Medium
Calculator Permitted
HL • Paper 2
Medium
Calculator Permitted

EcoStay (ES) operates eco-friendly hotels. Demand changes significantly between seasons. ES is considering adopting Charles Handy's Shamrock Organization by keeping a smaller core workforce, outsourcing cleaning and using flexible workers for events.

Table 7: Monthly labour cost data for ES

Item

Current structure

Proposed shamrock structure

Permanent housekeeping employees

40

0

Monthly cost per permanent housekeeping employee (US$)

2 200

Permanent maintenance employees

8

0

Monthly cost per permanent maintenance employee (US$)

2 800

Permanent IT and booking employees

6

0

Monthly cost per permanent IT and booking employee (US$)

3 200

Core employees

20

Monthly cost per core employee (US$)

3 100

Contract cleaning cost per month (US$)

48 000

Freelance maintenance hours per month

220

Cost per freelance maintenance hour (US$)

38

Flexible event staff hours per month

900

Cost per flexible event staff hour (US$)

18

Monthly quality monitoring cost (US$)

3 500

A

Calculate the percentage change in ES's monthly labour cost if it adopts the proposed shamrock structure. Show all your working.

[3]
B

Comment on whether adopting the Shamrock Organization is appropriate for ES.

[2]
Question 16
SL • Paper 1
Hard
Calculator Permitted
SL • Paper 1
Hard
Calculator Permitted

Coast & Clay (CC) is a family-owned business that manufactures handmade ceramic tableware for restaurants and home customers. CC currently has a tall organizational structure: supervisors report to production managers, who report to the operations director, who reports to the managing director. Decisions about supplier changes, quality issues and overtime must be approved by senior managers.

A recession has reduced demand from restaurants and CC’s cash flow has worsened. The managing director is considering delayering by removing the production manager level. Supervisors would report directly to the operations director and would be given more authority to solve production problems. CC estimates that delayering would reduce annual salary costs, but some experienced production managers would leave the business.

A

Evaluate the appropriateness for CC of delayering its organizational structure.

[10]

Build a Practice Exam — Business and Management HL

Test your knowledge with a custom paper containing questions from selected topics.

Practice exam question preview
Practice exams dashboard preview
Question 17
HL • Paper 2
Hard
Calculator Permitted
HL • Paper 2
Hard
Calculator Permitted

MedEquip (ME) manufactures specialist hospital equipment. Hospitals increasingly demand customized products. ME is considering restructuring from a functional structure to a matrix structure with project teams. Senior managers have prepared a force field analysis and estimated first-year financial effects.

Table 8: Force field analysis and first-year financial estimates for ME

Item

Score / annual amount

Driving force: faster product customization

4

Driving force: lower idle labour time

3

Driving force: improved collaboration between engineers and marketers

5

Restraining force: confusion from dual reporting lines

4

Restraining force: disruption from training

3

Restraining force: employee union concerns

2

Current annual penalties for delayed customized contracts (US$)

180,000

Expected annual penalties after restructuring (US$)

60,000

Number of departmental middle managers removed

3

Annual salary per removed middle manager (US$)

64,000

Number of new project managers

2

Annual salary per new project manager (US$)

70,000

One-off training cost in first year (US$)

45,000

A

Calculate the net force field score for the proposed restructuring. Show all your working.

[2]
B

Calculate the first-year net financial saving from the proposed restructuring. Show all your working.

[2]
C

Comment on whether ME should proceed with the restructuring to a matrix structure with project teams.

[2]
Question 18
SL • Paper 2
Hard
Calculator Permitted
SL • Paper 2
Hard
Calculator Permitted

Canal Coffee (CC) operates 18 coffee shops in three cities. CC has grown by offering the same menu, store layout and service standards in every shop. Its current organizational structure is centralized and mainly functional: marketing, operations, finance and human resources decisions are made at head office. Store managers must obtain approval before changing prices, launching local promotions or adjusting opening hours.

New competitors are using social media trends and city-specific promotions to attract customers. CC’s store managers argue that they understand local customers better than head office. The chief executive officer is considering changing to a more decentralized regional structure, with one regional manager for each city and more authority delegated to store managers.

Table 1 shows selected data for CC’s current structure and the proposed regional structure.

Indicator

Current centralized structure

Proposed regional structure

Coffee shops (number)

18

18

Cities served (number)

3

3

Approval time for local promotions (days)

12

3

Average customer complaint response time (days)

6.5

2.0

Forecast additional contribution from local promotions (US$ per year)

0

135,000

Savings in head-office administration (US$ per year)

0

42,000

Annual salary cost of new regional managers (US$ per year)

0

165,000

Staff satisfaction with decision-making (%)

54

72

A

Using the data in Table 1 and your knowledge of organizational structure, evaluate whether CC should change to a more decentralized regional structure.

[10]
Question 19
SL • Paper 2
Hard
Calculator Permitted
SL • Paper 2
Hard
Calculator Permitted

Mosaic Toys (MT) manufactures educational toys for retailers. MT is currently organized by function, with separate design, operations, marketing and finance departments. This structure has helped MT control costs and maintain consistent quality.

External conditions are changing. Demand for app-linked science, technology, engineering and mathematics (STEM) kits is increasing rapidly, while demand for traditional wooden puzzles is falling. Large retailers now expect toy manufacturers to launch updated product ranges more quickly and to provide product-specific marketing support.

MT’s directors are considering changing from a functional structure to a product structure, with separate divisions for wooden puzzles, STEM kits and creative art kits. Each division would have its own product manager, marketing team and operations planner.

Table 2 shows selected data about MT and the proposed structural change.

Data item

Value

Wooden puzzles demand forecast

-12%

STEM kits demand forecast

+28%

Average product development time: current

9 months

Average product development time: forecast

5 months

Retailer satisfaction: current

61%

Retailer satisfaction: forecast

78%

Extra annual salary cost from duplicated roles

US$240,000

Extra annual contribution from faster launches

US$310,000

A

Using the data in Table 2 and your knowledge of organizational structure, discuss whether MT should change from a functional structure to a product structure.

[10]
Question 20
SL • Paper 1
Hard
Calculator Permitted
SL • Paper 1
Hard
Calculator Permitted

FreshLoop (FL) produces chilled ready meals made from surplus vegetables. FL began in one country with a functional structure: marketing, operations, finance and human resources report to the chief executive officer (CEO). FL has recently started selling through supermarket chains in three neighbouring countries. Customer tastes, food-labelling rules and delivery expectations differ in each country. Local supermarket buyers complain that FL’s head office is too slow to approve changes to recipes and packaging.

The CEO is considering changing from a functional structure to a regional structure, with separate country managers responsible for sales, local marketing and some operational decisions. Finance and food-safety standards would remain controlled by head office.

A

Discuss whether FL should change from a functional structure to a regional structure.

[10]

Build a Practice Exam — Business and Management HL

Test your knowledge with a custom paper containing questions from selected topics.

Practice exam question preview
Practice exams dashboard preview
Question 21
HL • Paper 1
Hard
Calculator Permitted
HL • Paper 1
Hard
Calculator Permitted

SafeRide Analytics (SRA) develops software that helps bus companies monitor driver safety. SRA has grown quickly after new government transport regulations required bus operators to provide detailed safety reports. SRA currently has a flat, informal structure. Software developers, customer-support employees and sales staff communicate directly with the founder, who makes most major decisions.

SRA’s largest customers now want guaranteed response times, documented procedures and consistent compliance reports. Some employees value SRA’s creative culture and worry that more formal rules will slow innovation. The founder is considering a more centralized and bureaucratic structure, with a compliance department, formal approval procedures and clearer reporting lines.

A

Evaluate whether SRA should become more centralized and bureaucratic.

[10]
Question 22
HL • Paper 2
Hard
Calculator Permitted
HL • Paper 2
Hard
Calculator Permitted

Civitas Analytics (CA) is a consultancy that provides data analysis for city governments. CA is currently organized by function, with separate departments for data science, software development, client support and finance. This structure has supported professional standards, but complex client contracts increasingly require employees from several departments to work together.

Demand for climate-risk and transport-planning projects is growing, but contracts vary in length and required expertise. Some projects require specialist knowledge only for a few weeks. CA has missed several deadlines because functional managers compete for the same employees.

CA’s directors are considering two options:

  • Option 1: Change to a project-based organization, with temporary project teams led by project managers. Employees would still receive professional support from their functional specialists.
  • Option 2: Adopt Charles Handy’s Shamrock Organization, retaining a smaller core workforce, using external contractual specialists and employing flexible analysts during peak demand.

Table 3 shows selected data for CA’s current structure and the two options. For this question, calculate forecast net contribution as annual project contribution minus annual labour costs and project/contract management costs.

Structure

Annual labour costs / US$

Project/contract management costs / US$

Annual project contribution / US$

Projects delivered late / %

Permanent employees

Contractual/flexible workers

Workload/stress (1=low, 5=high)

Current functional structure

4,320,000

0

5,600,000

35

120

No

4

Option 1: Project-based organization

4,520,000

160,000

6,350,000

14

120

No

3

Option 2: Shamrock organization

3,980,000

210,000

6,050,000

20

80

Yes: external specialists and flexible analysts

3

A

Using the data in Table 3 and your knowledge of organizational structure, recommend whether CA should choose Option 1 or Option 2.

[10]
Question 23
HL • Paper 3
Hard
Calculator Permitted
HL • Paper 3
Hard
Calculator Permitted

RootsReach Food Cooperative (RFC) – a social enterprise

Read the resources and answer the questions that follow.

Resource 1 — Background of the social enterprise

RootsReach Food Cooperative (RFC) is a social enterprise that buys surplus vegetables from small farms and uses them to produce low-cost meal boxes for families on low incomes. RFC’s mission is to reduce food waste and improve access to healthy food. It operates from one central kitchen and distributes meal boxes through community centres in one city.

RFC currently has a tall, functional organizational structure. The chief executive officer (CEO) approves most decisions, including changes to meal-box contents, delivery routes and local partnerships. Managers believe this centralization protects food safety and consistency. However, community-centre coordinators say that local demand changes quickly and that waiting for head office approval often causes missed opportunities to redistribute surplus food.

Resource 2 — Table 1: Selected operational information for RFC

Table 1 shows selected data for RFC’s current centralized functional structure and a proposed decentralized regional structure. It compares average approval time, monthly food waste, paid management posts, training costs for regional coordinators and number of community partners served.

Resource 3 — Social-media statistic

A recent RFC post asking families to suggest culturally appropriate meal-box recipes received 8 400 views, 760 comments and 1 900 shares in three days. Many comments requested different meal boxes in different neighbourhoods.

Resource 4 — Quotation from RFC’s operations manager

“Our food safety standards cannot vary between neighbourhoods. A single mistake could damage trust in RFC and harm vulnerable families.”

Resource 5 — Strategic options being considered by RFC

Option A: keep the current tall functional structure but improve communication software.

Option B: change to a regional structure with three regional coordinators who can approve local partnerships, recipe adaptations and delivery-route changes within agreed limits.

Option C: delayer by removing one middle-management level and giving community-centre coordinators more delegated authority, while keeping food safety decisions centralized.

Operational measure

Current centralized functional structure

Proposed decentralized regional structure

Average approval time / days

5

1

Monthly food waste / kg

1,200

700

Paid management posts / number

4

7

Training cost for regional coordinators / US dollars

0

12,000

Community partners served / number

12

18

1

With reference to Resource 1, describe one feature of RFC’s current organizational structure.

[2]
2

Using Resource 2 and Resource 4, explain one advantage and one disadvantage for RFC of decentralizing more decisions to regional coordinators.

[6]
3

Using all the resources provided and your knowledge of business management tools and theories, recommend a possible plan of action for RFC’s organizational structure over the next three years.

[17]
Question 24
HL • Paper 3
Hard
Calculator Permitted
HL • Paper 3
Hard
Calculator Permitted

CareCycle Mobility (CCM) – a social enterprise

Read the resources and answer the questions that follow.

Resource 1 — Background of the social enterprise

CareCycle Mobility (CCM) refurbishes donated bicycles, wheelchairs and mobility scooters, then sells or leases them at low prices to older people and people with disabilities. CCM also trains unemployed adults in repair skills. Its mission is to increase independent mobility while reducing waste.

CCM has grown from one workshop to seven repair hubs in different towns. It currently has a tall, centralized structure. Each hub has a supervisor who reports to a regional manager, who reports to the operations director. Decisions about spare-parts suppliers, volunteer schedules and customer-priority rules are approved at head office. Hub supervisors argue that local customer needs differ and that the structure is too slow. The finance director is concerned that some hubs have low utilization and high permanent staffing costs.

Resource 2 — Table 1: Selected staffing and service information for CCM

Table 1 shows selected data for CCM’s seven repair hubs, including permanent repair employees, volunteer hours, average customer waiting time, spare-parts stock-outs, seasonal demand variation and annual management salary costs.

Resource 3 — Quotation from CCM’s founder

“Our customers need reliable support, not just cheap repairs. If we outsource too much or rely heavily on casual workers, we may lose the trust and repair knowledge that make CCM different.”

Resource 4 — Social-media statistic

After a local disability charity criticized CCM online for long waiting times, the post was shared 3 200 times. However, many comments praised individual hub employees for understanding local customer needs.

Resource 5 — Structural options being considered by CCM

Option A: delayer by removing the regional manager level so hub supervisors report directly to the operations director.

Option B: adopt elements of Charles Handy’s Shamrock Organization: keep a smaller core workforce of master repairers and customer advisers, outsource transport and accounting, and use flexible workers during seasonal peaks.

Option C: change to a decentralized regional structure, allowing hub supervisors to choose some local suppliers, volunteer schedules and customer-priority rules within head-office guidelines.

Hub

Permanent repair employees

Volunteer hours/week

Average customer waiting time / days

Stock-outs / month

Seasonal demand variation / %

Annual management salary cost / £000 per year

Hub 1

16

9

1.8

0

12

145

Hub 2

9

30

4.9

6

58

84

Hub 3

11

22

3.4

3

36

98

Hub 4

15

10

1.6

1

15

136

Hub 5

8

34

5.2

7

62

79

Hub 6

10

18

2.9

2

25

93

Hub 7

13

15

2.3

1

20

117

1

With reference to Resource 1, describe one feature of CCM’s current tall organizational structure.

[2]
2

Using Resource 2 and Resource 3, explain one advantage and one disadvantage for CCM of adopting elements of Charles Handy’s Shamrock Organization.

[6]
3

Using all the resources provided and your knowledge of business management tools and theories, recommend a possible plan of action for CCM’s organizational structure over the next four years.

[17]

Build a Practice Exam — Business and Management HL

Test your knowledge with a custom paper containing questions from selected topics.

Practice exam question preview
Practice exams dashboard preview
Question 25
HL • Paper 3
Hard
Calculator Permitted
HL • Paper 3
Hard
Calculator Permitted

SolarBridge Learning (SBL) – a social enterprise

Read the resources and answer the questions that follow.

Resource 1 — Background of the social enterprise

SolarBridge Learning (SBL) designs and installs small solar-powered digital classrooms for rural schools. SBL is a social enterprise: profits from commercial training contracts are reinvested into subsidized installations for schools in low-income communities. Its social objective is to improve access to education while creating skilled employment for young technicians.

SBL currently uses a functional structure with separate operations, education-content, finance, marketing and technology departments. Each department has its own manager. As demand has grown, SBL has struggled to deliver projects on time because school installations require people from several departments to work together. Some staff complain that they receive conflicting priorities from functional managers and project coordinators.

Resource 2 — Table 1: Selected project performance information for SBL

Table 1 shows selected project data for SBL, including the number of school installations, average project completion time, percentage of projects completed late, number of departments involved per project, staff turnover in project teams and estimated annual coordination costs.

Resource 3 — Quotation from a school headteacher

“The solar classroom has changed our students’ lives, but SBL’s installation date changed three times. Our community volunteers lost confidence because communication came from too many different people.”

Resource 4 — Social-media statistic

A video showing students using one of SBL’s digital classrooms reached 220 000 views and led to 46 enquiries from NGOs in four countries within two weeks.

Resource 5 — Structural options being considered by SBL

Option A: keep the functional structure but create clearer standard operating procedures for departments.

Option B: introduce a matrix structure in which staff remain in their functions but are also assigned to project managers for each school installation.

Option C: become a project-based organization, creating temporary cross-functional teams responsible for each installation from design to handover.

Year

School installations (number)

Average completion time (weeks)

Projects completed late (%)

Departments involved per project

Staff turnover in project teams (%)

Estimated annual coordination costs (thousands of US dollars)

2020

6

5.5

10

3

6

12

2021

9

6.3

18

4

8

18

2022

13

7.1

25

4

10

26

2023

18

8.2

34

5

14

37

2024

24

9.5

42

5

17

51

1

With reference to Resource 1, describe one reason why SBL’s current functional structure may cause problems for school installation projects.

[2]
2

Using Resource 2 and Resource 3, explain one advantage and one disadvantage for SBL of changing to a matrix structure.

[6]
3

Using all the resources provided and your knowledge of business management tools and theories, recommend a possible plan of action for SBL’s organizational structure over the next five years.

[17]