FreshCrust is a small bakery chain with six shops in one city. A power failure at its central kitchen stopped production for a day, causing lost sales and complaints from supermarket customers. The managing director now wants managers to understand the distinction between responding to crises and preparing for possible future disruptions.
Define the term crisis management.
Explain the difference between crisis management and contingency planning with reference to FreshCrust.
PureSip produces bottled fruit drinks for supermarkets. Several customers posted photos online of bottles with damaged seals. PureSip is investigating whether one batch may have been contaminated. The operations director must decide how to manage communication with customers, supermarkets and regulators.
Explain how transparency and communication could affect PureSip’s crisis management.
Hilltop Events organizes outdoor music festivals. After heavy rain forced the cancellation of its largest festival, the owners are considering a contingency plan that would include emergency shelter, alternative suppliers, staff training and a system for notifying ticket holders.
Explain one cost impact and one time impact of contingency planning for Hilltop Events.
GreenCart is an online grocery retailer. A warehouse refrigeration failure spoiled fresh food and delayed deliveries. The customer service team responded slowly because managers had not agreed who could authorize refunds or communicate with customers. GreenCart is reviewing the factors that affect effective crisis management.
Explain how communication and control could improve GreenCart’s crisis management.
Build a Practice Exam — Business and Management HL
Test your knowledge with a custom paper containing questions from selected topics.


MediQuick, a courier business delivering medicines to pharmacies, is considering a contingency plan for storm damage at its main depot. Without the plan, managers would have to rely mainly on crisis management after a storm occurs.
Measure | Value |
|---|---|
Average orders delivered per day | 1200 orders |
Contribution per order | USD 8 |
Expected downtime after a serious storm without a standby depot | 3.5 days |
Expected downtime after a serious storm with a standby depot | 1.0 day |
Monthly standby depot fee | USD 6000 |
Calculate the reduction in lost contribution from using the standby depot for one serious storm. Show all your working.
Comment on whether the standby depot is financially justified for MediQuick if one serious storm occurs in the month.
MedixLab manufactures specialist diagnostic kits for hospitals. Its main supplier of sterile plastic tubes recently warned of possible delivery delays. MedixLab is considering holding more inventory and approving a second supplier as part of a contingency plan, but its finance manager is worried about higher costs.
Outline two possible contingency planning actions MedixLab could take.
Explain one benefit and one limitation of these contingency planning actions for MedixLab.
PureBite, a yoghurt manufacturer, discovered possible contamination in one product line. Senior managers compared an improvised crisis response with an existing recall contingency protocol.
Item | Improvised crisis response | Recall contingency protocol |
|---|---|---|
Time between discovery and first public recall notice / hours | 30 | 6 |
Estimated affected units sold during the delay / units | 22000 | 4000 |
Compensation cost per affected unit sold / USD | 1.50 | 1.50 |
One-off product testing cost under the protocol / USD | 0 | 12500 |
Calculate the reduction in compensation cost from using the recall contingency protocol, before taking the testing cost into account. Show all your working.
Comment on the likely impact of speed and public communication on PureBite's crisis management.
BlueHarbour Hotel is deciding whether to introduce an annual emergency evacuation contingency plan. The plan includes training, updated signage and evacuation drills. Managers estimate that the plan will reduce the time the hotel is closed during each emergency or serious false alarm.
Item | Figure |
|---|---|
Staff training cost per year | USD 9600 |
Emergency signage cost per year | USD 2400 |
Paid staff time for drills per year | USD 3000 |
Average closure time per incident without the plan | 6 hours |
Average closure time per incident with the plan | 2 hours |
Expected number of incidents per year | 4 incidents |
Contribution lost per closure hour | USD 1100 |
Calculate the total annual cost of BlueHarbour Hotel's evacuation contingency plan. Show all your working.
Calculate the net annual financial impact of the plan, using the expected reduction in closure time. Show all your working.
Comment on one non-financial impact of the contingency plan for BlueHarbour Hotel.
Build a Practice Exam — Business and Management HL
Test your knowledge with a custom paper containing questions from selected topics.


TerraRide manufactures electric bicycles. It has received reports that some batteries may overheat. Managers must decide whether to make an immediate voluntary recall announcement or delay the announcement while they investigate.
Item | Immediate voluntary recall | Delayed announcement |
|---|---|---|
E-bikes sold | 12000 | 12000 |
Proportion of e-bikes potentially affected | 8% | 8% |
Proportion of potentially affected e-bikes returned | 65% | 75% |
Repair or refund cost per returned e-bike | USD 85 | USD 85 |
Estimated injury claims | 0 | 90 |
Average cost per injury claim | USD 0 | USD 1200 |
Calculate the repair or refund cost of the immediate voluntary recall. Show all your working.
Calculate the estimated injury claim cost if TerraRide delays the announcement. Show all your working.
Comment on the importance of transparency and control in TerraRide's crisis management.
MetroMed, a private clinic, is considering a contingency plan for sudden staff illness. The plan uses a bank of temporary nurses. The finance manager is concerned that the plan may not be financially worthwhile in months with only one staff illness incident.
Item | Without bank staff plan | With bank staff plan |
|---|---|---|
Appointments cancelled per staff illness incident | 45 appointments | 10 appointments |
Contribution per appointment | USD 35 | USD 35 |
Compensation cost per cancelled appointment | USD 20 | USD 20 |
Bank staff retainer per month | USD 0 | USD 4000 |
Bank nurse shifts used per incident | 0 shifts | 5 shifts |
Cost per bank nurse shift | USD 0 | USD 220 |
Calculate the reduction in cancellation cost from using the bank staff plan for one staff illness incident. Show all your working.
Calculate the net financial impact of the bank staff plan in a month with one staff illness incident. Show all your working.
Comment on one non-financial reason why MetroMed might still keep the bank staff plan.
SkyTrail is a regional airline. A software failure in its booking system led to cancelled flights and long queues at airports. Some airport staff gave passengers different information, and rumours spread on social media that SkyTrail had lost all customer data. Senior managers are trying to regain control of the situation.
Analyse the importance of speed and control in SkyTrail’s crisis management.
UrbanClimb operates indoor climbing centres. A minor accident at one centre revealed that some staff were unsure how to evacuate injured customers and contact emergency services. The operations manager proposes a contingency plan including risk assessments, first-aid training, equipment checks and clearer shutdown procedures for climbing walls.
Analyse the impact of contingency planning on risks and safety at UrbanClimb.
Build a Practice Exam — Business and Management HL
Test your knowledge with a custom paper containing questions from selected topics.


RiverCare runs residential care homes for elderly people. A nearby river sometimes floods after storms. The board is considering a detailed contingency plan including evacuation transport, backup medicine storage, staff drills and agreements with another care provider to house residents temporarily. Some directors argue that the plan will be expensive and may never be needed.
Analyse the impact of contingency planning for RiverCare in terms of cost, time, risks and safety.
SwitchWare, an online electronics retailer, is considering a cloud backup contingency plan to reduce the impact of cyber outages. The operations director is concerned about the monthly cost because outages are not frequent.
| Item | Without cloud backup | With cloud backup |
|---|---|---|
| Time to restore online sales system after an outage | 18 hours | 5 hours |
| Contribution lost per hour of outage | USD 900 | USD 900 |
| Emergency IT consultancy cost per outage | USD 7000 | USD 2000 |
| Monthly cloud backup fee | USD 0 | USD 4800 |
Item | Unit | Without cloud backup | With cloud backup |
|---|---|---|---|
Time to restore online sales system after an outage | hours | 18 | 5 |
Contribution lost per hour of outage | USD/hour | 900 | 900 |
Emergency IT consultancy cost per outage | USD | 7000 | 2000 |
Monthly cloud backup fee | USD/month | 0 | 4800 |
Calculate the total saving from one cyber outage if SwitchWare uses the cloud backup, before taking the monthly backup fee into account. Show all your working.
Calculate the minimum number of cyber outages per year needed for the cloud backup to cover its annual fee. Show all your working.
Comment on one risk-related reason why SwitchWare might still choose the cloud backup even if fewer than four outages are expected.
GulfLink Ferries is considering a contingency contract for a replacement vessel if one of its ferries has engine failure. The replacement vessel would reduce cancellations but requires a quarterly retainer.
Item | Without replacement vessel contract | With replacement vessel contract |
|---|---|---|
Average cancellations after engine failure / days | 2.0 | 0.5 |
Passengers per day | 700 | 700 |
Average contribution per passenger / USD | 12 | 12 |
Refund and goodwill cost per cancelled passenger / USD | 8 | 8 |
Activation cost per incident / USD | 0 | 6000 |
Quarterly retainer / USD | 0 | 18000 |
Calculate the contribution revenue saved per engine failure incident by using the replacement vessel contract. Show all your working.
Calculate the net financial effect of using the replacement vessel contract for one engine failure incident in a quarter. Show all your working.
Comment on one reason why GulfLink Ferries might still use the replacement vessel contract.
GreenGrid Farms, a vertical farming business, is deciding whether to introduce a water quality contingency plan. A recent contamination incident showed the difference between managing a crisis after contaminated produce reaches retailers and planning to detect contamination before delivery.
Item | No water quality contingency plan | Water quality contingency plan |
|---|---|---|
Recall cost if contaminated produce reaches retailers | 14,000 units × USD 2.20 per unit | USD 0 |
Shutdown time after contamination | 3 days | 1 day |
Contribution lost per shutdown day | USD 2,800 | USD 2,800 |
Emergency public relations cost | USD 5,000 | USD 0 |
Disposal cost for isolated produce | USD 0 | USD 3,000 |
Monthly water testing cost | USD 0 | USD 1,200 |
Calculate the total cost of the contamination crisis if GreenGrid Farms has no water quality contingency plan. Show all your working.
Calculate the monthly net saving if the water quality contingency plan prevents one such crisis in that month. Show all your working.
Comment on the difference between crisis management and contingency planning in this situation.
Build a Practice Exam — Business and Management HL
Test your knowledge with a custom paper containing questions from selected topics.


CalmWave is a medium-sized manufacturer of baby skincare products. It sells mainly through pharmacies and online retailers. A small number of parents have complained on social media that one batch of baby lotion caused skin irritation. CalmWave has not yet confirmed whether the lotion is unsafe, but two major pharmacy chains have asked for an urgent explanation.
CalmWave has a basic quality control system but no detailed recall contingency plan. The operations director wants to create a plan that includes batch-tracing procedures, pre-approved communication templates, staff training, agreements with a product testing laboratory and a reserve fund for possible product recalls. The finance director argues that serious product safety problems are rare and that managers should deal with such events through crisis management if and when they happen.
Discuss whether CalmWave should develop a detailed recall contingency plan rather than rely mainly on crisis management.
PolarPack Ltd manufactures insulated packaging for seafood exporters. A two-day port closure last year caused missed deliveries and spoiled customer orders. The operations director argues that PolarPack should create a contingency plan that includes a pre-approved road freight contract, emergency cold-storage space and named managers with authority to contact customers. The finance director argues that PolarPack should not commit funds before a disruption occurs and should manage any future crisis reactively.
PolarPack's managers have prepared estimated financial and operational data comparing the two approaches.
Metric | Reactive crisis management | Contingency plan |
|---|---|---|
Annual preparation cost / US$ | 0 | 32,000 |
Extra delay after port reopens / days | 1.5 | 0.5 |
Lost contribution per day / US$ | 20,000 | 20,000 |
Spoilage / compensation cost per disruption / US$ | 36,000 | 8,000 |
Named manager authorised to contact customers | No | Yes |
Customer communication response time (hours) | 12 | 1 |
Repeat orders from affected customers / % | 68 | 88 |
Recommend whether PolarPack Ltd should introduce the contingency plan rather than rely mainly on crisis management after a disruption occurs. Use the data to make a conditional recommendation based on the expected frequency of similar closures; if this frequency is unknown, state the break-even frequency and explain how the customer-service benefits affect the decision.
MetroFit operates 28 low-cost gyms in large cities. During a busy evening, a fire alarm failed at one gym and members were evacuated only after staff noticed smoke from an electrical fault. Nobody was seriously injured, but videos of confused employees and angry customers were widely shared online. A local newspaper reported that some staff told members the gym would reopen the next morning, while the head office later announced that the site would remain closed for safety checks.
The chief executive wants to lead the response personally. The operations manager argues that MetroFit’s crisis management should focus mainly on regaining control of the site and reopening quickly. The marketing manager argues that transparency and communication with members, staff, landlords and regulators are more important because the brand depends on trust.
Evaluate the importance of transparency, communication, speed and control in MetroFit’s crisis management.
NorthPeak Adventures operates guided mountain cycling holidays. It has grown rapidly by promoting challenging routes in remote areas. Most customers are experienced cyclists, but some are international tourists unfamiliar with local weather conditions. Recently, a sudden storm caused a group to be stranded for six hours with limited phone signal. No one was injured, but customers complained that guides did not have enough emergency equipment and that families were not kept informed.
NorthPeak is considering a contingency plan for extreme weather and remote-route incidents. The plan would include satellite phones, emergency shelters at two key locations, guide training, revised risk assessments, a customer contact system and agreements with a local rescue service. The founder is concerned that the plan would be costly, take time away from selling holidays and make the business appear less adventurous.
Evaluate the impact of contingency planning on NorthPeak Adventures in terms of cost, time, risks and safety.
Build a Practice Exam — Business and Management HL
Test your knowledge with a custom paper containing questions from selected topics.


AssessPro is a private online assessment platform used by schools to run timed examinations. During a peak examination week, a software update caused some students to lose access to the platform. Within two hours, students and teachers were posting complaints on social media. Senior managers disagreed about the crisis response: the marketing director wanted to wait until the technical fault was fully understood before making a public statement, while the operations director wanted an immediate update, a temporary manual submission system and a named spokesperson.
AssessPro's managers have collected estimated data on the likely effects of alternative crisis responses.
Crisis-response approach | Time to first update (h) | Exam sessions affected | Service-credit cost (US$) | Support requests | Expected renewals (%) | Recovery time (h) |
|---|---|---|---|---|---|---|
Delay until verified | 6.0 | 58 | 24,000 | 420 | 71 | 36 |
Immediate update | 0.5 | 34 | 18,000 | 260 | 83 | 22 |
Immediate + manual/spk | 0.5 | 16 | 12,000 | 140 | 91 | 24 |
Evaluate the importance of transparency, communication, speed and control in AssessPro's crisis management.
Read the resources and answer the questions that follow.
ReNet Works (RW) is a social enterprise based in a coastal city. It collects discarded fishing nets from ports and converts them into storage crates sold to schools and small retailers. RW employs and trains former fishers whose incomes have fallen because of declining fish stocks. Any surplus is reinvested into beach clean-up programmes and safety training for fishing communities.
RW has grown quickly and recently won a three-year contract to supply 18 local schools. Its operations depend on one shredding machine, one rented workshop and a small team of 22 employees. The founder, Maia, has always focused on social impact and has not developed a detailed contingency plan.
A minor fire started in RW's shredding room after plastic dust overheated near the machine. No employees were seriously injured, but the workshop was closed by the landlord pending a safety inspection. Two school deliveries were delayed. A local news website reported that 'toxic smoke from recycled waste' had spread near homes, although the fire service has not confirmed this.
| Item | Figure |
|---|---|
| Average weekly sales revenue | USD 26 000 |
| Contribution lost for each day the workshop is closed | USD 3 200 |
| Estimated repair and deep-cleaning cost | USD 18 500 |
| Cash reserves | USD 21 000 |
| Cost of annual safety audit and staff fire drills | USD 7 800 |
| Time required to approve a backup subcontractor | 6 weeks |
A video of smoke outside RW's workshop received 310 000 views in 24 hours. RW has 42 000 followers on its main social-media account, but it has not posted an update since the fire.
'Our mission is to protect the sea and create meaningful work. I am worried that spending scarce funds on backup systems and safety drills will reduce the money available for community projects, but I also know that parents, schools and employees need reassurance.'
Resource | Key information | Figure / detail |
|---|---|---|
1 | Social enterprise in a coastal city; collects discarded fishing nets and converts them into storage crates; trains former fishers; surplus reinvested into beach clean-up and safety training; one shredding machine, one rented workshop, 22 employees. | Background |
2 | Minor fire in the shredding room after plastic dust overheated near the machine; no serious injuries; workshop closed by landlord pending safety inspection; two school deliveries delayed; local report claimed toxic smoke, but fire service has not confirmed this. | Crisis details |
3 | Average weekly sales revenue | USD 26,000 |
3 | Contribution lost for each day the workshop is closed | USD 3,200 |
3 | Estimated repair and deep-cleaning cost | USD 18,500 |
3 | Cash reserves | USD 21,000 |
3 | Cost of annual safety audit and staff fire drills | USD 7,800 |
3 | Time required to approve a backup subcontractor | 6 weeks |
4 | Smoke video views in 24 hours | 310,000 |
4 | Followers on main social-media account | 42,000 |
4 | Main social-media account update since fire | No update posted |
5 | Founder quotation | "Our mission is to protect the sea and create meaningful work. I am worried that spending scarce funds on backup systems and safety drills will reduce the money available for community projects, but I also know that parents, schools and employees need reassurance." |
Explain the difference between crisis management and contingency planning with reference to RW.
Analyse the importance of speed and transparency in RW's crisis management.
Using all the resources provided and your knowledge of business management tools and theories, recommend a possible plan of action for RW over the next 12 months.
Read the resources and answer the questions that follow.
BridgeBytes (BB) collects donated laptops from companies, refurbishes them and provides them at very low prices to refugees, unemployed adults and students from low-income families. BB also runs free digital skills workshops. It is legally a private limited company but operates as a social enterprise: 70 percent of any surplus is reinvested into training and device donations.
BB relies on 65 volunteers and 11 paid employees. Its reputation depends on trust because some donated laptops previously held confidential corporate data. BB uses a basic checklist for wiping devices but has no formal contingency plan for data security failure or for communicating with donors if something goes wrong.
A school reported that a refurbished laptop supplied by BB still contained old files from a donor business. The files did not include customer bank details, but they included employee names and salary information. The donor business has suspended further donations and is considering legal action. BB's staff disagree about whether to issue a public apology before the investigation is complete.
| Risk | Current control | Proposed contingency action |
|---|---|---|
| Data not fully removed from donated devices | Volunteer checklist | Paid external audit every quarter |
| Loss of donor confidence | Informal emails from founder | Named spokesperson and donor update schedule |
| Volunteer error during refurbishment | One-day induction | Refresher training and sign-off by paid technician |
| Sudden shortage of usable laptops | None | Agreements with two backup donors |
| Item | Figure |
|---|---|
| Average number of laptops supplied per month | 480 |
| Average contribution per laptop | USD 24 |
| Estimated quarterly external audit cost | USD 4 500 |
| Estimated cost of volunteer refresher training each year | USD 6 000 |
| Expected time to create and test a data-breach contingency plan | 10 weeks |
A post by a technology journalist about the data error has been shared 8 600 times. One donor manager wrote: 'We support BB's mission, but we cannot risk our employees' data being mishandled.'
Section | Item | Detail |
|---|---|---|
Background | Organisation | Private limited company; social enterprise; 70% of any surplus reinvested in training and device donations |
Background | Workforce | 65 volunteers and 11 paid employees |
Background | Trust context | Some donated laptops previously held confidential corporate data |
Background | Current control | Basic device-wipe checklist; no formal contingency plan for data-security failure or donor communication |
Crisis | Incident | Refurbished laptop still contained old files from a donor business |
Crisis | Data involved | Employee names and salary information; no customer bank details |
Crisis | Donor response | Further donations suspended; legal action being considered |
Risk register | Data not fully removed | Current control: volunteer checklist; proposed contingency: paid external audit every quarter |
Risk register | Loss of donor confidence | Current control: informal emails from founder; proposed contingency: named spokesperson and donor update schedule |
Risk register | Volunteer error | Current control: one-day induction; proposed contingency: refresher training and sign-off by paid technician |
Risk register | Usable laptop shortage | Current control: none; proposed contingency: agreements with two backup donors |
Selected data | Laptops supplied per month | 480 |
Selected data | Average contribution per laptop | USD 24 |
Selected data | Quarterly external audit cost | USD 4,500 |
Selected data | Volunteer refresher training cost per year | USD 6,000 |
Selected data | Time to create and test contingency plan | 10 weeks |
Social media | Post reach | Shared 8,600 times |
Social media | Donor manager quote | "We support BB's mission, but we cannot risk our employees' data being mishandled." |
Explain one way in which BB's current situation shows the difference between crisis management and contingency planning.
Analyse two possible impacts of contingency planning for BB in terms of cost, time, risks or safety.
Using all the resources provided and your knowledge of business management tools and theories, recommend a possible plan of action for BB for the next two years.
VeloChem Ltd manufactures specialist cleaning chemicals for bicycle repair shops. Its production site is close to a residential area. A recent minor leak was contained quickly, but it revealed that some employees were unsure of the evacuation procedure and that the emergency contact list was out of date. The production manager proposes a comprehensive contingency plan including annual safety drills, upgraded sensors, emergency containment equipment, extra insurance and a contract with a specialist clean-up company. The finance manager is concerned about the cost and the time required to train staff and test the plan.
VeloChem's board has been given estimates of the likely costs and operational effects of the proposed contingency plan.
Indicator | Current position | With contingency plan |
|---|---|---|
Total extra annual spend (£/year) | £0 | £46,000 total (drills £6k; sensors £9k; equipment £11k; contract £12k; ins +£8k) |
Staff training/testing time (hours/year) | 0 | 36 |
Serious leak probability (% per year) | 10% | 6% |
Shutdown after serious leak (days) | 6 | 2 |
Clean-up + compensation after serious leak (£) | £280,000 | £110,000 |
Evacuation time after alarm (minutes) | 9 | 4 |
Reportable injuries in serious leak (number) | 3 | 1 |
To what extent should VeloChem Ltd implement the comprehensive contingency plan?
Build a Practice Exam — Business and Management HL
Test your knowledge with a custom paper containing questions from selected topics.


Read the resources and answer the questions that follow.
SafePlate Collective (SPC) is a social enterprise that prepares affordable ready meals for elderly people and families on low incomes. It buys imperfect vegetables from local farms and receives donated dry ingredients from supermarkets. SPC sells meals through community centres and delivers some meals free to people referred by charities.
SPC's mission is to reduce food waste and improve nutrition. It has expanded from 1 200 meals per week to 5 500 meals per week in two years. Most food preparation is carried out by paid staff, but labelling and packing are supported by volunteers. SPC has basic food hygiene procedures but no fully tested contingency plan for allergen labelling errors.
A customer with a severe nut allergy was admitted to hospital after eating an SPC vegetable curry. The meal label did not list nuts, but one donated ingredient may have been processed in a facility handling nuts. SPC stopped production of the curry but continued producing other meals. Community centres are asking whether all SPC meals are safe. Some volunteers are unsure what to tell customers.
| Item | Figure |
|---|---|
| Meals currently prepared each week | 5 500 |
| Proportion of meals supplied free to referred users | 28 percent |
| Average contribution per paid meal | USD 1.10 |
| Estimated cost of a full allergen audit | USD 9 200 |
| Estimated time for staff and volunteer retraining | 4 weeks |
| Current cash reserves | USD 14 500 |
A community centre's post asking whether SPC meals are safe has received 2 400 comments, many from relatives of elderly customers. SPC's own update only stated: 'We are looking into the issue.'
'Stopping all meal production would protect us while we investigate, but it would also leave hundreds of vulnerable people without affordable meals this week. We need a plan that protects safety without abandoning our mission.'
Resource | Information |
|---|---|
| SafePlate Collective (SPC) prepares affordable ready meals for elderly people and low-income families; it buys imperfect vegetables and donated dry ingredients; sells through community centres and delivers some meals free to people referred by charities; mission is to reduce food waste and improve nutrition; output has grown from 1,200 meals/week to 5,500 meals/week in two years; volunteers help with labelling and packing; no fully tested contingency plan for allergen labelling errors. |
| A customer with a severe nut allergy was admitted to hospital after eating SPC vegetable curry; the meal label did not list nuts; one donated ingredient may have been processed in a facility handling nuts; SPC stopped production of the curry but continued producing other meals; community centres are asking whether all SPC meals are safe; some volunteers are unsure what to tell customers. |
| Meals currently prepared each week: 5,500; proportion supplied free to referred users: 28%; average contribution per paid meal: USD 1.10; estimated cost of a full allergen audit: USD 9,200; estimated time for staff and volunteer retraining: 4 weeks; current cash reserves: USD 14,500. |
| A community centre post asking whether SPC meals are safe has received 2,400 comments, many from relatives of elderly customers; SPC’s own update only stated: “We are looking into the issue.” |
| “Stopping all meal production would protect us while we investigate, but it would also leave hundreds of vulnerable people without affordable meals this week. We need a plan that protects safety without abandoning our mission.” |
Describe one stakeholder safety risk that SPC should consider in contingency planning.
Analyse the importance of communication and control in SPC's crisis management.
Using all the resources provided and your knowledge of business management tools and theories, recommend a possible plan of action for SPC over the next 18 months.